The equipment of transport mechanization of pipes transfer in the sixth span of pipe electric welding shop no.4 is intended to replace the existing single-thread transmission roller conveyor PR-30 in order to increase the productivity when feeding pipes on the process flow.
Outer pipe diameter 508…1422mm
Pipe length 9…12,4 m
Pipe weight, not more 21000 kg
Line productivity up to 75 pipes/hour
Weight of equipment 64 t
Model IMS079