Engineering company "INTERMASHSTROY" designs and manufactures automated transport lines for the production of pipes of different diameters. We connect technological equipment with the transport system of the line, creating a single production cycle of various technological operations, such as:

  • Pipe cooling;
  • Pipe straightening;
  • Coupling cutting, clutch screwing, application chamfer on the end of a pipe;
  • Repairs and improvements of the surface of the pipe;
  • Pipe hardening
  • Pipe quality control (ultrasonic control, magnetic liquid control, x-ray method, vortex-current method;
  • Hydraulic testing of pipes by internal pressure
  • Hydraulic testing of pipes by external pressure (Collapse test)
  • Control of pipe parameters (measurement of weight, length, geometry, thread control, etc.))
  • Coating of pipes(polyurethane foam, pipe painting, etc.)
  • Packaging the tubes in packs and locating blocks
  • Transport system of lines

 

For each technological process the most optimal design solution is selected, which allows to increase productivity by reducing the time for moving the pipe from one technological operation to another and by automating technological operations.

Also, transport mechanization lines are used as storage (pockets, temporary warehouses), distributors for different technological operations, depending on the technology of their production, bunching (packaging of pipes).

Depending on the process operation, the mass and geometry of the pipe, the path from one process chain to another, different types of construction systems are used:

  • Chain conveyor
  • Rotation settings
  • Cross pipe transfer trolleys
  • Transport roller with bi-conical rollers
  • Roller conveyor
  • Discharging pockets
  • Spiral roller
  • Transport roller tables with measurement of length and weight of pipes
  • Shifters
  • Non-standard transport equipment according to the Customer's task

The INTERMASHSTROY company designs and makes "turnkey" technological lines of any complexity and for any sizes of pipes

 

Contact us


 

Our projects:

Additional Info

  • Year of project completion 2021
  • Customer АО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД»

Media

Additional Info

  • Year of project completion 2016
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Additional Info

  • Year of project completion 2016
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Media

Additional Info

  • Year of project completion 2016
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД» (JSC "VOLZHSKY PIPE PLANT")

Media

Additional Info

  • Year of project completion 2015
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Media

Additional Info

  • Year of project completion 2015
  • Customer АО «ИЗОТЕХ ИНВЕСТ» (JSC «IZOTEKH INVEST»)

Additional Info

  • Year of project completion 2015
  • Customer Ателье Рош CAC, Франция (Atelier Roche SAS, France)

Media

Additional Info

  • Year of project completion 2014
  • Customer ОАО «ГАЗПРОМТРУБИНВЕСТ» - Волгореченский трубный завод (JSC "GAZPROMTRUBINVEST" - Volgorechensky pipe plant)

Additional Info

  • Year of project completion 2014
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Additional Info

  • Year of project completion 2014
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Additional Info

  • Year of project completion 2013
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД» (JSC "VOLZHSKY PIPE PLANT")

Additional Info

  • Year of project completion 2013
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД»

Additional Info

  • Year of project completion 2013
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД» (JSC "VOLZHSKY PIPE PLANT")

Additional Info

  • Year of project completion 2013
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД» (JSC "VOLZHSKY PIPE PLANT")

Additional Info

  • Year of project completion 2013
  • Customer ОАО «ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД» (JSC "VYKSA METALLURGICAL PLANT")

Additional Info

  • Year of project completion 2012
  • Customer ОАО «ВОЛЖСКИЙ ТРУБНЫЙ ЗАВОД» (JSC "VOLZHSKY PIPE PLANT")

Additional Info

  • Year of project completion 2009
  • Customer ОАО "ВЫКСУНСКИЙ МЕТАЛЛУРГИЧЕСКИЙ ЗАВОД" (JSC "VYKSA METALLURGICAL PLANT")